The Mathilo Gaddigad Hydropower Project is a run-of-the-river (ROR) type
hydropower project, located in Purbichauki Gaunpalika, Doti District
of Province No. 7, Nepal. Here is a brief information on the project.
Overview
Type: Run of the River (ROR) hydropower project
Location: Purbichauki Rural Municipality, Doti District, Province No. 7, Nepal
Installed Capacity: 1,550 kW
Annual Energy Generation: 8.42 GWh
Geographic Information
Coordinates:
Weir Site: 29° 16’ 41” N, 81° 03’ 25” E
Powerhouse Site: 29° 17’ 30” N, 81° 06’ 30”
Elevation: 926.95 m (Powerhouse)
Nearby Locations: 2.5 km upstream from Sanjighat,
45 km northeast of Dipayal,
30 km from Silgadhi
S.N.
Distance From
To
Distance (Km)
Route
1
Shankhamul, Kathmandu
Attariya, Kailali
648.0
Prithivi / Mahendra Highway
2
Attariya
Dipayal Silgadhi
202.0
Mahakali / Mid-Hill Highway
3
Dipayal Silgadhi
Sanjighat
25.0
Mid-Hill Highway
4
Sanjighat
Powerhouse
0.5
Mid-Hill Highway
5
Powerhouse
Intake
2.0
Earthen Road
Total Road Length From KTM to Intake
877.5
Hydrological Features
River: Gaddigad, a tributary of the Seti River, flowing into the Karnali
Design Discharge: 2.01 m³/s (40% dependable flow)
Gross Head: 102.5 m over alignment stretch of approx 2.0 km
Infrastructure Details
Weir Location: Right bank of Gaddigad, 200 m upstream of suspension bridge
Powerhouse Location: Left bank near Sanjighat Bazar
Pipeline:
Low pressure pipe through forest and cultivated land
High-pressure penstock beyond surge pipe
Mostly buried with crossings at valleys & rivers
Tailrace Canal: Approx. 16 m discharge back into Gaddigad